Below are some of the standard construction packages provided by us but we also customize the packages based on the customer need.
|
|
|
|
PRODUCT NAME |
UNIT |
BASIC |
STANDARD |
PREMIUM |
LUXURY |
CIVIL WORK MATERIAL |
|||||
Foundation
stone |
No |
28.00 |
30.00 |
35.00 |
45.00 |
Aggregates 20
mm |
CFT |
25.00 |
28.00 |
31.00 |
34.00 |
Aggregates 40
mm |
CFT |
22.00 |
25.00 |
28.00 |
30.00 |
4” Cement block |
No |
28.00 |
30.00 |
35.00 |
45.00 |
6” Cement block |
No |
32.00 |
35.00 |
45.00 |
55.00 |
Red bricks |
No |
8.00 |
9.00 |
10.00 |
11.00 |
M Sand |
Ton |
750.00 |
750.00 |
950.00 |
950.00 |
C Sand |
Ton |
900.00 |
900.00 |
1100.00 |
1100.00 |
P Sand |
Ton |
1300.00 |
1300.00 |
1400.00 |
1400.00 |
Cement |
Bag |
375.00 |
400.00 |
425.00 |
450.00 |
Iron Rod TMT |
Ton |
56000.00 |
62000.00 |
68000.00 |
74000.00 |
DOORS & WINDOWS |
|||||
Teak doors
and frames |
CFT |
3500.00 |
4000.00 |
4500.00 |
5000.00 |
Other doors
and frame |
CFT |
1300.00 |
1700.00 |
2100.00 |
2500.00 |
Readymade door |
SFT |
125.00 |
225.00 |
325.00 |
425.00 |
Main door
locking system |
No |
1000.00 |
1800.00 |
2600.00 |
3400.00 |
Other door
locking system |
No |
550.00 |
650.00 |
950.00 |
1050.00 |
Door stopper |
No |
120.00 |
140.00 |
160.00 |
180.00 |
Window
stopper |
No |
45.00 |
65.00 |
85.00 |
105.00 |
Main door tower
bolt |
No |
50.00 |
100.00 |
150.00 |
200.00 |
Puja door
tower bolt |
No |
50.00 |
100.00 |
150.00 |
200.00 |
Normal door Tower
bolt |
No |
45.00 |
65.00 |
85.00 |
105.00 |
Hinges for
doors |
No |
75.00 |
90.00 |
110.00 |
130.00 |
Hinges for windows |
No |
35.00 |
45.00 |
55.00 |
65.00 |
Main door handle |
No |
650.00 |
950.00 |
1250.00 |
1550.00 |
Puja door
handle |
No |
250.00 |
350.00 |
450.00 |
550.00 |
Normal door
handle |
No |
150.00 |
200.00 |
250.00 |
300.00 |
Aluminium
Windows |
SFT |
250.00 |
450.00 |
650.00 |
850.00 |
Glasses |
SFT |
35.00 |
45.00 |
60.00 |
70.00 |
TILING & FLOORING |
|||||
Flooring
Tiles |
SFT |
55.00 |
75.00 |
95.00 |
115.00 |
Wall Tiles |
SFT |
40.00 |
55.00 |
70.00 |
85.00 |
Parking Tiles |
SFT |
45.00 |
55.00 |
65.00 |
75.00 |
Stair case
flooring - Granite |
SFT |
75.00 |
95.00 |
115.00 |
140.00 |
BATHROOM & KITCHEN |
|||||
Commode set |
No |
4500.00 |
7500.00 |
10500.00 |
13500.00 |
Wash basin |
No |
1500.00 |
2500.00 |
3200.00 |
4500.00 |
Bath 3 in 1
shower set |
No |
3500.00 |
4500.00 |
6500.00 |
7500.00 |
2 in 1 Taps |
No |
1000.00 |
1500.00 |
2000.00 |
2500.00 |
General taps |
No |
800.00 |
1200.00 |
1600.00 |
2000.00 |
Kitchen sink |
|
2100.00 |
4500.00 |
6500.00 |
8500.00 |
ELECTRICAL & HARDWARE |
|||||
Electrical
wires |
All |
Anchor |
Anchor |
Anchor |
Anchor |
Electrical
Switches & sockets |
All |
Anchor |
Anchor |
Anchor |
Anchor |
CPVC pipes
and fittings |
All |
Ashirwad |
Ashirwad |
Ashirwad |
Ashirwad |
PVC pipes and
fittings |
All |
Supreme |
Supreme |
Supreme |
Supreme |
Water motor
pump |
No |
7500.00 |
9500.00 |
10500.00 |
11500.00 |
Water storage
tank |
Litre |
7.00 |
8.50 |
9.00 |
10.50 |
PAINT & POLISH |
|||||
External wall
primer |
All |
Asian |
Asian |
Asian |
Asian |
External
painting |
Asian |
Ace Shyne |
Apex Ultima |
Apex Ultima
Stretch |
Apex Ultima
Protek |
Internal wall
primer |
All |
Asian |
Asian |
Asian |
Asian |
Internal
painting |
Asian |
Tractor |
Premium |
Royal |
Royal |
Wood and
steel primer |
All |
Asian |
Asian |
Asian |
Asian |
Enamel painting |
All |
Tractor enamel |
Apcolite
Premium |
Apcolite advanced
|
Apcolite
advanced epoxy |
Polish work |
|
Hand |
Hand |
Machine |
Machine |
WATER PROOFING |
|||||
Roof water
proofing |
All |
Normal |
Fosroc |
Tiling |
Tiling |
Other waterproofing |
All |
Fosroc |
Fosroc |
Fosroc |
Fosroc |
|
|
|
|
|
|
WORK
DESCRIPTION |
Earth
work
|
Foundation
work
|
RCC
Work
|
Walls
and masonry work
|
Plastering
work
|
Flooring
Work
|
Doors
& Windows
|
Kitchen
Work
|
Electrical
Work Providing and Fixing electrical items as per the design. Below are sample points which will be used across the building
|
Plumbing
Works Providing and Fixing plumbing items as per the design. Below are sample points which will be used across the building
|
Water
proof Providing &
laying water proof over RCC slab and finished with spreading cement slurry
& laying screed concrete in Cement Mortar 1:4 and mixed with water proof compound
of approved make (Fosroc or equivalent brand) laid to required gradients
& slope, the top finished with leak-proof joints for:
|
Painting Work
|
Fabrication
Work
|
Miscellaneous
Works
|
NOTE: This is indicative price. Please contact us for actuals.