Cement, Sand, Aggregate proportion during building construction. This is the standard requirements but may change based on the site condition. Structural engineer inputs are mandatory. 



SL    Description               Grade of          Cement / Sand / Aggregate

No                                     Concrete             (Proportion)                    

1.    PCC Foundation            M 10                            1 : 3 : 6  / 1 : 4 : 8

2.    Footing Concrete           M 20                             1 : 1.5 : 3

3.    Plinth Concrete              M 20                             1 : 1.5 : 3

4.    Columns Concrete         M 25                             1 : 1 : 2

5.    Lintel / chajja                  M 15                             1 : 2 : 4

6.    RCC Slab                       M 20                             1 : 1.5 : 3

7.    Stone Masonry                                                    1 : 6

8.    Bricks Masonry                                                    1 : 5 / 1 : 6

9.    Ceiling Plastering                                                 1 : 3 / 1 : 4

10.  Outside Plastering                                                1 : 4 / 1 : 5

11.  Inside Plastering                                                   1 : 4 / 1 : 5