Footing Concrete using M20 grade
Footing Concrete is the first concrete during building construction. Entire load of the building is taken by this footing so this is the need for having good concrete.
M20 grade (1:1.5:3) 1 Portion Cement, 1.5 Portion Sand and 3 Portion of aggregate is the minimum requirement for footing concrete.
Comments
Post a Comment