3D Elevation for our Projects at Hebbal

  Below are the photographs of 3D Elevation for our project at Hebbal (Bangalore).     CLICK FOR MORE POSTS    

Extending the Concrete roof

   Extending the concrete roofs is one of the challenging tasks in building construction. below are some of the actions that need to be taken care Removing the existing concrete to expose the steel bar. Additional steel needs to be welded in an L manner Additional Crank support needs to be provided Join fillers chemical need to be applied on existing concrete Concealed beams need to be given as per the situation.     CLICK FOR MORE POSTS    

Our Completed False Ceiling work at Bangalore.

 Our Completed False Ceiling work at Bangalore. We do customized work based on customer needs.  Below are some of the site photos executed by us.     CLICK FOR MORE POSTS    

Showcase , TV Units & Interior work

  Our Completed showcase and interior work.      CLICK FOR MORE POSTS    

Bar Bending - An Important task in Building construction

   Bar Bending is an important task which needs to be done by professional ONLY. The design will be given by the structure engineer which needs to be followed without any second thought. Below are some of the points that need to be taken care of before concreting Shuttering should be checked using water tube level and Spirit level The use of plastic on the shuttering protects the cement slur from getting out. Use of mat is suggested as it gives rough finish which helps during plastering the ceiling. An extra bar needs to be checked for each beam. The lapping of the columns needs to be checked.       CLICK FOR MORE POSTS    

Completed Residential Project @ Hebbal (Bangalore)

Below is our completed residential project at Hebbal (Bangalore).  Ground Floor: 2 BHK, 1 Parking, and a Garden Place First Floor: 2 BHK Second Floor: Water Tank and Open Roof      CLICK FOR MORE POSTS    

Roof Concreting using M20 Concrete Grade at JP Nagar 8th Phase

Roof Concreting using M20 Concrete Grade at JP Nagar 8th Phase, Bangalore. The use of a Concrete Vibrator is a must that helps spreading and to compact concrete in Beam and slab.      CLICK FOR MORE POSTS    

Completed Residential Construction @ JP Nagar 8th Phase, Bangalore

   Our Completed Residential Construction project @ JP Nagar 8th Phase, Bangalore Ground Floor: 3 BHK with Puja room, Car Parking, and a Garden. First Floor:  3 BHK with Puja room Second Floor:  3 BHK with Puja room Third Floor:  1 BHK with Puja room     CLICK FOR MORE POSTS    

Residential building extension work using cement block @ JP Nagar 8th Phase Bangalore

   Started building extension work on 2nd Floor @ JP Nagar 8th Phase Bangalore. Used Cement block to construct the wall.     CLICK FOR MORE POSTS    

Completed Residential Building Construction at JP Nagar 8th Phase - Bangalore

Our Completed  Residential Building Construction at JP Nagar 8th Phase - Bangalore     CLICK FOR MORE POSTS    

Building construction using Porotherm bricks @ Bannerghatta Road Bangalore

  New Building Construction using Porotherm bricks. Plastering is not needed on the wall. It makes building cool during summer.      CLICK FOR MORE POSTS    

Building Renovation & Interior work @ HSR Bangalore

Executed Building Renovation & Interior work in a duplex house in HSR Layout Bangalore.     CLICK FOR MORE POSTS